# MetlSys > MetlSys is a UK-built ERP for steel and stainless steel stockholders and the > engineering firms they supply. It runs the whole operation in one system: > AI goods-in, heat and mill certificate traceability (EN 10204 types 2.1 to 3.2), > stock and warehousing, cutting and production, subcontract processing, > despatch with electronic proof of delivery, invoicing with accounting export, > a customer portal, and a built-in AI assistant. Made by Reload IT Ltd > (company no. 10106178), registered office 124 City Road, London, EC1V 2NX. > Data is hosted in London (eu-west-2). Key facts: - Product: MetlSys, multi-tenant SaaS ERP for the steel stockholding trade - Audience: steel and stainless stockholders, metal service centres, engineering firms holding traceable material - Differentiators: batch and heat genealogy that survives splits, cuts, remnants and subcontract loops; mill test certificates as first-class records matched by heat number; certificate gates at allocation and despatch; two-stage goods receipt (book in now, confirm weight later); cut-piece pricing with kerf and facing allowance by saw type; catch-weight dual units (theoretical and actual weight) - AI: reads mill certificates, delivery notes and purchase orders into reviewable drafts; the assistant answers questions from live data (report queries are read-only) and drafts actions that run only once a person confirms; customer data is not used to train AI models - Tiers: Lite GBP 395/month, Professional GBP 995/month, Corporate on request. Priced by named full-user band (1-5 / 6-20 / 21+) with unlimited warehouse and shop-floor users on every tier. Prices exclude VAT. - Accounting: a ledger-ready CSV export from posting runs, covering the sales and purchase ledgers, which you import into your accounting package (an export you run, not a live sync) - Login: https://app.metlsys.com - Contact: https://metlsys.com/contact or info@metlsys.com ## Pages - [Home](https://metlsys.com/): steel stockholding software without the paper chase, and who it is for - [How it works](https://metlsys.com/how-it-works): three step-by-step journeys on real screens (stockholding, subcontracting, engineering firms) - [Features](https://metlsys.com/features): nine modules, what each does and saves, plus the full feature list grouped by area - [AI & automation](https://metlsys.com/ai): AI that reads mill certificates and orders, the assistant, guided help - [Pricing](https://metlsys.com/pricing): Lite GBP 395/month, Professional GBP 995/month, Corporate on request - [Migration & custom work](https://metlsys.com/migration): leave the legacy steel system in five stages and keep your history - [Security & reliability](https://metlsys.com/security): tenant isolation, roles, audit trail, UK hosting - [FAQ](https://metlsys.com/faq): straight answers on product, migration, AI, security, commercial and technical questions - [Request a demo](https://metlsys.com/contact): a walkthrough on your own workflow with the person who built it Last updated: 2026-11-03 ## Insights (full text) ## Cut-piece pricing: kerf, facing allowance and the saw maths behind an honest price Published 2026-11-01 by Mark Brookes. Source: https://metlsys.com/insights/cut-piece-pricing-kerf-allowance A customer rings for twenty pieces of 50mm bright round, 300mm long. The quick answer is length times weight per metre times price per kilo. It is also the wrong answer, because a 300mm piece does not consume 300mm of bar. The saw takes some. The ends need cleaning up. Whatever is left at the end of the bar may or may not be sellable. Every stockholder with a saw knows this. The question is whether the price on the quote knows it too. This article sets out the arithmetic behind an honest cut-piece price, works through an example, and shows where the money leaks when the sums are done in someone's head. ## What a cut piece actually consumes Three things sit between the length the customer ordered and the length you have used up: - **Kerf.** The width of material the blade removes in each cut. It leaves the building as swarf, and you paid for it by the kilo. - **Facing allowance.** Extra length added so the ends can be faced or cleaned up. The customer receives a clean 300mm piece; you cut something longer to get there. - **What is left over.** The end of the bar after the last cut, plus any end trim taken off the bar before the first one. The first two belong in the price of every piece. The third belongs in the price of the job, and whether it costs you anything depends on what you can do with it. ## Kerf depends on the saw Kerf is not one number for the business. It depends on the machine. A bandsaw blade is thin. A circular cold saw blade is thicker. If you run more than one type of saw, the same cut length consumes different amounts of bar depending on where the job is sent. That matters for two reasons. First, a fixed allowance set for one saw is wrong for the others. Second, the person quoting often does not know which saw the job will go on. If the allowance is built into a mental rule of thumb, it is built for whichever saw the estimator had in mind on the day. The honest approach is to hold the kerf against each saw type and let the price follow the machine. ## Facing allowance: the ends nobody ordered Most customers ordering cut-to-length bar want the stated length, with ends that are square and clean. Getting there means cutting slightly long and facing each end. So the facing allowance applies twice per piece, once at each end. It is a small figure. It is also on every piece, which is why it matters. ## A worked example Take the order above. 50mm bright round weighs about 15.41kg per metre. For illustration, assume a bandsaw kerf of 2mm, a facing allowance of 1.5mm at each end, and a selling price of £2.10 per kilo. The chargeable length of each piece is the cut length plus the kerf plus the facing allowance at both ends: 300mm + 2mm + (2 × 1.5mm) = 305mm | Basis | Length per piece | Weight for 20 pieces | Price at £2.10/kg | |---|---|---|---| | Cut length only | 300mm | 92.5kg | £194.21 | | Chargeable length | 305mm | 94.0kg | £197.45 | The difference is £3.24 on this job, about 1.7%. Small on one quote. Not small across a year of cut-to-length work, and it is margin you have already spent on material. Now run the same order at 50mm long. The chargeable length is 55mm, so kerf and facing add 10% to the material in every piece. Short pieces are where the saw maths hurts most. A quote priced on cut length alone gets less honest the shorter the pieces get, and the estimator rarely notices because the job looks small. ## Minimum usable length: the offcut that cannot exist Carry on with the 300mm order. Say the bar comes in 3m lengths and you trim 10mm off the end before the first cut. That leaves 2,990mm. At 305mm a piece you get nine pieces from a bar, with 245mm left over. Is 245mm a remnant or scrap? That depends on your minimum usable length for that size and grade. If your rule is that anything under 300mm is not worth putting back on the rack, those 245mm ends are scrap, and the job needs three bars, not two and a bit. This is where quotes go wrong in the other direction. Someone promises an offcut back to stock, or prices the job assuming the leftover will sell, and the leftover is too short to be anything. A price that ignores minimum usable length is quietly assuming a remnant that cannot exist. The useful rule is simple. Below the minimum, the leftover is scrap and its cost belongs to the job. At or above it, it goes back into stock as a remnant, with its own value. ## Pricing the piece versus pricing the job Kerf and facing are per-piece costs. They go into the chargeable length of every piece, every time. End trim and the final leftover are job costs. How much they cost you depends on the cutting plan: how many pieces you get from each bar, what is left, and whether that leftover clears your minimum length. Two orders for the same total length can produce very different scrap depending on the cut lengths. So there are really two questions: 1. What is the honest price per piece, allowing for kerf and facing? 2. What does this job do to the bar, and is the leftover stock or scrap? Most pricing mistakes in cut-to-length work come from answering the first and forgetting the second, or from answering neither and pricing on cut length. ## Why this lives in spreadsheets General-purpose systems price a line as quantity times rate. They have no concept of a saw, a kerf or a facing allowance. So stockholders do the saw maths elsewhere: a spreadsheet beside the quoting screen, a laminated card by the phone, or one experienced estimator who just knows. Each of those works until it does not. The spreadsheet has the old kerf figure for a saw you replaced. The card does not cover the new size range. The estimator is on holiday, and the person covering prices on cut length because that is what the screen shows. ## How MetlSys handles it MetlSys does the saw maths at the point the order is priced, as part of [sales order entry](/features#sales-orders): - **Chargeable length** is the cut length plus kerf plus a facing allowance at each end. - **Kerf is set per saw type**, so the allowance follows the machine. - **Minimum usable length flags** stop anyone promising an offcut that cannot exist. The same thinking carries through to the shop floor. Works orders show the theoretical yield, with kerf and end trim allowed for, before anyone touches a saw, and 1D cutting lists handle kerf, end trim and minimum offcut. When the works order runs, it creates one batch per cut length, remnant batches at or above your minimum length and scrap below it, and records the actual yield along with the input, product, remnant and scrap weights. Cut pieces carry the parent's full unit cost and its heat number and certificate, so margin and traceability both survive the saw. Cut pricing and production are on the Professional and Corporate tiers, not Lite. ## The short version An honest cut-piece price is the cut length plus kerf plus facing at both ends, with kerf taken from the saw that will do the job. A cutting plan that respects minimum usable length tells you whether the leftover is stock or scrap. Do both where the order is priced and the margin you quoted is the margin you make. If you want to see your own awkward cut-to-length job priced and planned end to end, [request a demo](/contact). --- ## Same-day invoicing: cash flow is a paperwork-latency problem Published 2026-10-15 by Mark Brookes. Source: https://metlsys.com/insights/same-day-invoicing Ask a stockholder how long their customers take to pay and you get a number. Thirty days, forty-five, "longer than they should". Ask how long it takes to raise the invoice after the steel is delivered and you usually get a pause. That pause is the point of this article. Most of the cash-flow conversation in this trade is about the back end: chasing, credit limits, the customer who always pays on day 58. Far less is said about the front end, the days between the material arriving on site and the invoice existing at all. Those days are yours to fix, and nobody else is going to fix them for you. ## Where the days go Follow a typical delivery through a typical office. The driver drops the load at 11am. The customer's storeman signs the delivery note. The signed copy goes into the cab door pocket. The driver does three more drops and gets back at 4pm. The paperwork goes into a tray. Tomorrow, someone in the office works through the tray. They find the order, check the signed copy against what was sent, and note any shortage or damage. If the order was sold on actual weight, they check the weight is confirmed. Then they raise the invoice. Maybe. If it is a busy day, the tray waits. If the POD is missing, it waits longer. If the delivery note was signed with a note scrawled in the margin, it waits until someone rings the customer. None of this is anyone's fault. It is just a chain with a lot of hand-offs, and each one adds a day. Two to five working days is common. Some firms still batch invoices weekly. A few still invoice at month end. ## What the gap costs Take a stockholder turning over £4.8 million a year. That is about £13,000 of sales a calendar day. If the average gap between delivery and invoice is a week, there is roughly £92,000 sitting in the business that should already be on its way back. On an 8% overdraft that is around £7,400 a year in interest, before you count the extra working capital you could have put into stock. The customer has not paid late. They have paid exactly on terms. Your terms started a week after they should have. ## Month-end terms make it worse Plenty of the trade sells on 30 days end of month. On those terms one day of delay can cost you a whole month. Deliver on 31 October and invoice the same day, and payment is due at the end of November. Invoice it on 1 November, because the tray was full on Friday, and payment is due at the end of December. Same steel. Same customer. Same terms. Thirty extra days of credit given away by a paperwork queue. ## Why chasing harder does not fix it When cash is tight the instinct is to tighten credit control. Shorter reminder intervals. Firmer phone calls. A stop on the slow payers. All of that is worth doing. But credit control only works on invoices that exist. It cannot chase a delivery that has not been billed yet. If the leak is between the POD and the invoice, a sharper dunning ladder is chasing the wrong end of the chain. There is a second cost, too. An invoice raised a week after delivery is more likely to be queried. The customer's goods-in has moved on. The storeman who signed has forgotten. A query on a late invoice adds another week. ## Fix the chain, not the people Same-day invoicing is not about working faster. It is about removing the hand-offs that make the gap. Three things have to be true. 1. **The proof of delivery has to come back immediately.** Not in the cab door. Not tomorrow. Captured at the door and in the system before the lorry leaves the customer's site. 2. **Problems have to be recorded at the door.** A short or a damaged bundle needs to be on the record at the point of delivery, so the office can tell a clean POD from one that needs attention without phoning anyone. 3. **The invoice basis has to be settled before despatch.** Theoretical or actual weight, the price, carriage, any alloy surcharge. If those are decided when the order is taken, there is nothing left to work out when the POD lands. When all three are true, a clean delivery needs no human decision to bill. Only the exceptions do. Your office stops processing every delivery and starts handling the few that went wrong. ## How MetlSys handles it This is how I built the despatch-to-invoice chain in MetlSys, because I watched offices lose days to exactly this. The driver, or the customer, opens a single-use proof of delivery link on their phone. It captures the signature on the glass and any exceptions, such as shortages or damage. The signature is printed on the delivery note itself, so the copy you file, email or share is the proof of delivery. A clean POD can trigger the invoice automatically. Invoices raise from the delivery note on theoretical or actual weight, whichever the order specified, and you can still raise them singly or in bulk if you prefer to look first. Billable carriage and itemised alloy surcharge ride the order through to the invoice, so they are not added by hand afterwards. For the ones that do not go cleanly, the delivery notes list counts what is waiting for proof of delivery, what has a delivery exception and what is waiting to be invoiced. The invoices list has a short queue of delivered but not invoiced. So the gap is visible every morning, not discovered at month end. Invoicing sits on the Professional and Corporate tiers. The detail is on the [financial integration section of the features page](/features#finance). There is no judgement call hidden in software here. A clean POD is a signature with no exceptions recorded. Anything else stays on the list for a person to deal with. ## A test for Monday Pull your last twenty deliveries. For each one, note the delivery date and the invoice date. Work out the average gap in days. If it is zero or one, you are ahead of most of the trade. If it is three or more, multiply that by your daily sales figure. That is the money your paperwork is holding. Then look at which step is slowest. In most offices it is not the invoice. It is the POD getting back to the desk. If you want to see a delivery go from signature to invoice on your own kind of order, [request a demo](/contact). --- ## What is a heat number? Steel traceability from cast to customer Published 2026-10-01 by Mark Brookes. Source: https://metlsys.com/insights/what-is-a-heat-number Ask anyone on a stockholder's shop floor what a heat number is and you get a quick, confident answer. Ask them to prove one, from a piece on the rack back to a certificate and forward to a customer, and it gets slower. This article covers what a heat number is, where it lives, what it is tied to, and where stockholders lose it. ## What a heat number is A heat number identifies a single melt of steel. The mill melts a furnace charge, adjusts the chemistry, casts it, and gives that cast an identifier. Everything rolled or forged from it shares that number. You will also hear "cast number" and "melt number". In everyday trade use they point at the same thing: the identity of the cast the material came from. The heat matters because chemistry is set at the melt. The carbon, chromium, nickel and molybdenum in a 316L bar were fixed when it was cast. The heat number is how you connect a physical piece of steel to the analysis that describes it. ## Where you find it On the material, if the mill has done its job. Bar ends are commonly stamped, painted or tagged. Plate is usually stamped near the edge. Bundles carry a tag. Coil carries a label. On the paperwork, in two places: - The mill test certificate, which states the heat and the analysis for it. - The mill's delivery documentation, which links the heat to what was shipped. If the number on the steel and the number on the certificate do not agree, you have a problem before the material has even been unloaded. That check is the first reason the heat number earns its place. ## What the heat number is tied to Three things hang off it. 1. **The certificate.** The mill test certificate reports chemistry and, for most products, mechanical results, for that heat. It carries an EN 10204 type, which tells you who validated it. Our [EN 10204 explainer](/insights/en-10204-explained) covers 2.1 to 3.2. 2. **The grade claim.** A bar sold as 316L is 316L because the certificate for its heat says the chemistry falls within the standard's limits. Without the link, the grade is an assertion. 3. **The customer's requirement.** Many customers specify a minimum certificate type, or require the cert to travel with the delivery. The heat number is how you show the cert you send relates to the steel on the wagon. ## Heat number, batch and lot are not the same This is where confusion starts, and it matters once you hold stock. A heat is the mill's unit. It is one melt. A single heat can be rolled into a lot of bar, and one delivery can include several heats. One certificate can cover several lengths of the same heat. A batch, in your own books, is your unit. It is one receipt of one product with one location, weight and cost. So the relationship is not one to one. A delivery of 20 bars might be one heat or three. Two deliveries a month apart might share a heat. Your records have to hold the heat on every batch and let several batches point at the same certificate. Treating "heat" and "batch" as synonyms is how stock records end up unable to answer a simple question: which certificate belongs to this piece? ## Where stockholders lose the thread The mill gives you a clean heat number. Most of the damage is done afterwards, in four places. **Goods in.** The delivery note says one thing, the cert says another, and somebody retypes a heat number from a PDF. One transposed digit and the batch is tied to the wrong certificate, or none. Nothing looks wrong until an audit. **Cutting.** Take a 6 m bar of one heat and saw it into pieces. Every piece is the same cast, so every piece needs the same heat and certificate. If the cut pieces are only identified by a chalk mark and a job number, the heat is held by the memory of whoever cut them. **Offcuts.** The remnant that goes back on the rack is the most exposed material in the building. It is certified steel with an unreliable label. We wrote about that in [the remnant graveyard](/insights/remnant-graveyard). **Subcontract processing.** Material goes out for polishing, machining or testing, and comes back with a subcontractor's paperwork and your own. Unless the heat travels with it, the return is steel with a history gap. In each case the material is fine. The record is what fails. ## What a clean audit trail looks like Traceability sounds abstract until a customer's quality manager phones. The test is simple. Pick a piece of steel you delivered last year. Can you answer all of these in minutes? - What heat was it? - Which certificate covers that heat, and what type is it? - Which receipt did the material come in on, and from which supplier? - If it was cut, which parent did it come from, and what else came off the same parent? - If it went out for processing, did it come back with the heat and cert intact? - Which delivery note and invoice did it leave on? Every one of those is a lookup if the heat has been carried correctly. If it has not, every one is a search through email, folders and people's heads. ## How MetlSys carries the heat MetlSys is built so the heat number is attached to the batch from the point of receipt and does not come off. On goods in, you drop the delivery note and mill cert on the receipt. The extraction reads the heat number, grade, certificate type, chemistry and mechanicals and proposes them. A person checks them against the source PDF and confirms. Nothing posts until they do. The certificate is stored as a record, with its reference, heat, type, grade, standard, chemistry and mechanicals alongside the PDF, and matched to batches by heat number. Loose certificates that arrive later can be matched by heat in one go. Anywhere you are offered a batch, one with no certificate linked is flagged. When a batch is split or cut on a works order, every child inherits the parent's heat and certificate. When material goes to a subcontractor and returns, the return books in as a child batch with the certificate re-linked to it. At despatch, MetlSys checks each line against the certificate requirement. It blocks when no certificate is linked, when the type is below what the customer or line requires, or when the cert's heat or grade does not match the batch or line. The certificate pack then goes out with the delivery note. The result is that the question "which heat is this?" has one answer, held in one place, from the day it was booked in. ## The practical test Do this once, this week. Take three deliveries from the last quarter, one of them cut. Trace each from the customer's delivery note back to the mill certificate and the original receipt, and time it. If it takes minutes, your heat numbers are doing their job. If it takes an afternoon, or one of them cannot be done, you have found the gap an auditor or a customer will find for you. For how the heat number works through the rest of the stock process in a stainless operation, see [MetlSys for stainless steel stockholders](/solutions/stainless-steel-stockholders). If you want to see your own heat numbers followed from receipt to despatch, [request a demo](/contact). --- ## The remnant graveyard: why certified offcuts get weighed in as scrap Published 2026-09-15 by Mark Brookes. Source: https://metlsys.com/insights/remnant-graveyard Every stockholder has one. A rack at the back, or a bay near the saw, holding material nobody quotes from. Good steel. Certified steel. Two metres of 316L bar with a chalk mark on the end, a bit of 304 plate with a label that has gone soft in the rain, three lengths that came back off a job in March. Everyone knows roughly what it is. Nobody can prove exactly what it is. So it sits. Then one day the rack is needed, or the stocktake comes round, or someone has a tidy-up, and the lot goes in the skip for scrap value. That is paid-for, certified material being sold for a fraction of what it cost. Not because the material failed. Because the record did. ## The material outlives the paperwork A remnant is not a different kind of steel. It is the same cast, the same grade, the same certificate as the bar it came off. Nothing about the metal changed when the saw went through it. What changed is that the identity moved from the system to a human. The parent batch had a heat number, a mill certificate, a cost and a location on a screen. The offcut has a chalk mark and somebody's memory. Memory has a half-life of about three weeks in a busy warehouse. After that the offcut is anonymous. And anonymous steel cannot be sold to anyone who needs traceability, which in this trade is nearly everyone. So the offcut quietly leaves the world of stock and enters the world of things on a rack. It is still on your balance sheet at full cost, because nobody told the system otherwise. It is still occupying racking you are paying for. It just cannot be sold. The whole loss happens in the ten seconds after the cut, when nobody creates a record. ## An offcut is a batch, or it is nothing The fix is not a better labelling system. It is deciding that a remnant is stock in its own right, with the same standing as anything else on the rack. In MetlSys, a works order consumes the parent bars and creates the output batches in one step. One batch per cut length, remnant batches at or above your minimum length, and scrap below it. The remnants are real batches: they carry the parent's heat number, certificate, grade, spec and finish, and they go back to free stock. Splitting a batch by hand does the same thing. The child remnant inherits the heat and the certificate, the weight is apportioned, and the genealogy is recorded. There is no point in the chain where the material exists without a record attached to it. That matters more than it sounds. The question a customer's quality manager asks two years later is not "is this 316L". It is "prove this piece came from that cast". An offcut created as a child of its parent can answer that. An offcut created by a chalk mark cannot, and never will, no matter how good your filing is afterwards. ## Three decisions that decide whether remnants survive Treating offcuts as stock forces three questions most systems never ask you. **What length is worth keeping?** Set a minimum. Above it, the piece becomes a remnant batch. Below it, it is scrap and gets recorded as scrap. Without that line, every warehouse drifts to one of two failures: keeping everything, so the rack fills with unsellable stubs, or keeping nothing, so usable material goes for weigh-in. The cutting list does the arithmetic with kerf, end trim and your minimum offcut already allowed for, so you see the theoretical yield before anyone touches a saw rather than finding out at the machine. **What is it worth?** This is where most firms give up, because the honest answer is awkward. A remnant is not worth what the full bar was worth per kilo, but it is not worth nothing either. MetlSys applies a remnant valuation policy you set: the parent's cost per kg less a percentage, 20% unless you change it, or full cost unchanged, or capped at a net realisable value you decide. Any of those is defensible. The one that is not defensible is leaving the whole rack at full cost and knowing privately that it is fiction. **Who is supposed to sell it?** A remnant that only gets found when a salesperson thinks to go and look is a remnant that gets found by accident, which is to say rarely. ## Make the offcut the first place the system looks This is the part that actually empties the graveyard, and it is a design decision rather than a feature. When stock is allocated automatically in MetlSys, flagged remnants outrank prime full lengths of the same stock code. Not as a report someone runs. As the default behaviour of the allocation. On a cut line, remnant recommendations score the candidates by least waste and oldest first, with a bonus for the same heat. The rep or the planner gets pointed at the offcut before the full bar, with a reason attached. Turn that round and look at what it replaces. The old way needs a person to remember the rack exists, walk to it, read a label, decide whether they trust it, and then make a judgement about whether cutting into a full bar is easier than arguing with the paperwork. Cutting into the full bar is always easier. So they cut the full bar, and the rack grows. Any system that relies on somebody choosing the harder option out of good intentions will fail, every time, on a busy Thursday. ## The certificate question, answered on sight There is one more reason remnants get avoided even when they are in the system: nobody is confident the cert is really attached. So a batch with no certificate linked to it should be obvious everywhere it appears, not just when you go hunting. In MetlSys it is flagged on sight on the batch picker, on the allocation picker, in stock availability on a quote, and in the remnant register itself. That removes the doubt in the moment it matters. If a remnant shows clean, the cert is there and the material can go out. If it is flagged, you know before you promise it, not after. ## What the rack is actually costing you Worth doing the sum once, properly. Take the weight of material sat in the remnant area. Price it at what you paid, not at scrap. Add the racking it occupies and the stock value tied up in it. Then ask how much of it left as scrap in the last twelve months. Most firms have never run that number, because the data to run it does not exist. When every works order records its actual yield percentage along with the input, product, remnant and scrap weights, it does. You can see what a bar genuinely gave you, job by job, rather than what it should have given you in theory. Yield stops being a thing people argue about at month end and becomes a number. That is the real argument for treating offcuts as stock. Not tidiness. The remnant graveyard is not a housekeeping problem, it is a margin problem that has been made invisible by a missing record. Once the record exists, the material is sellable, the valuation is honest, and the rack stops being where profit goes to be forgotten. More on how cutting, yield and remnants work in a service centre: [MetlSys for metal service centres](/solutions/metal-service-centre). If you want to see what your own remnant rack looks like once it is real stock, [request a demo](/contact). --- ## How to choose steel stockholding software: the questions worth asking before you sign Published 2026-09-01 by Mark Brookes. Source: https://metlsys.com/insights/how-to-choose-steel-stockholding-software Most stockholders buy a system twice in a working lifetime. You do it once, live with it for fifteen years, then do it again when the person who understood it retires. That is a hard thing to get good at, and the people selling to you do it every week. So the demo is not a fair fight. It runs on their data, with their favourite screens, on material that behaves. Below are the questions that separate a steel-native system from a general one. I build MetlSys, so I have an obvious interest here. I have tried to write the checklist I would want from your side of the table, including the bits where the honest answer is uncomfortable. ## Ask them to start from a batch, not a stock code Nearly every gap in this trade traces back to one design decision: what the system thinks the unit of stock is. A general inventory system thinks in part numbers and quantities. Ten of item X. A steel system has to think in batches: a physical lot with a heat number, a certificate, a theoretical weight, an actual weight, a cost and a location. Ten tonnes of 304 plate is not ten of anything. It is a set of specific pieces from specific casts, each with its own paperwork. You can tell within ten minutes which one you are looking at. Ask them to show you a stock line and then drill into the individual physical lots behind it. If the answer involves a custom field, a lot-tracking module or a consultant, the system started somewhere else and is trying to catch up. ## The five demo questions that find the gaps Ask these in the demo, in this order, on their system. Do not accept a slide. **1. Show me an offcut and walk it back to its certificate.** Take a bar, cut it, cut a piece off the remnant, then send that piece out for machining and bring it back. Now find the mill certificate for what came home. Every step in that chain is normal in a stockholder and every step is where a general system quietly drops the thread. In MetlSys, splits, cuts, remnants and subcontract returns all keep the genealogy, because a cut produces a child of the same cast rather than a new product. **2. Which weight does it invoice on, and who decides?** There are two weights on every batch, the theoretical one worked out from the section and the actual one off the scales, and they never agree. A system that holds a single quantity per line has already lost. Ask whether the invoice can be raised on either basis, whether that can vary by customer and grade, and what happens when the variance is large. MetlSys carries both weights, prices per kg, per metre, per each or as a lump sum, invoices on either basis, and flags a variance over 2% for review. **3. Can it stop a despatch?** Your customer requires 3.1 minimum. The batch on the forks only ever had a 2.2. Ask them to try to despatch it. A warning that a busy person can click past is not a control. In MetlSys, certificate types are ranked 2.1 to 3.2, each customer can carry a minimum acceptable type, and allocation and despatch gate on it. **4. Price me a cut length.** Not length times a rate. Cut length plus the kerf plus a facing allowance at each end, with the kerf depending on which saw does the job. If that arithmetic lives in a spreadsheet next to the quoting screen, you have bought half a system. MetlSys does the saw maths where the order is priced. **5. What happens to stock we have booked in but not weighed?** A delivery arrives with a theoretical weight on the note. The actual weight comes later. Everything sold in that window is guesswork. Ask what the system does in the gap. In MetlSys, goods-in supports a two-stage receipt: material books in from the delivery note and sits as awaiting-weight and unsellable until the actual weight is confirmed. At despatch the scales record gross, tare and net against the load. ## Then ask the questions that have nothing to do with features Features are the easy part of this decision. The expensive part is everything around them. **What happens to thirty years of history?** This is the real reason stockholders stay on software they have outgrown, and it deserves a proper answer rather than reassurance. Ask for the stages. A serious migration is analysis first, then a field-by-field mapping you sign off, then a trial run into a test company, then parallel running, then a planned cutover with the old data preserved. Ask specifically whether certificate PDFs get re-linked to batches by heat number, or whether they arrive as a folder of files. If somebody quotes you a migration timeline before looking at your data, they are guessing. Our [migration process](/migration) sets out the five stages and what moves at each one. **How is it priced, and what happens when the shop floor logs in?** Per-user pricing sounds fair until the warehouse needs accounts. Then a firm shares one login to save money and loses the audit trail it was paying for. Ask what an operator login costs, and ask what a read-only login costs. MetlSys prices on named full users only, Lite at £395 a month for one to five, Professional at £995 for six to twenty, Corporate on request above that, all excluding VAT. Warehouse, shop-floor, read-only and driver logins are unlimited and included on every tier. Implementation, migration and bespoke integrations are scoped separately, which is normal and should be said out loud rather than discovered later. **Where does the data live, and can we get it out?** Ask for the region, not the brand name. Ask what happens on exit. MetlSys runs its primary database as managed Postgres in London, with certificates and document bundles in private storage reached through short-lived signed links, and structured exports provided if you leave. **Who answers when it breaks?** There is a real difference between a support desk and the person who wrote the code. Both are legitimate. Just know which you are buying, and know the hours. Ours is email during UK business hours on a best-efforts basis, and the developer behind the product rather than a call centre. **What does it not do?** This is the most useful question in the whole list, and the answer tells you more about the supplier than any feature. Ours: there is no SLA and no uptime figure at this stage, point-in-time database recovery is not enabled yet, and the accounting link is a clean auditable CSV export rather than a live two-way sync. A supplier who cannot name a single limitation is either not listening or not telling you. ## Run the demo on your own worst paperwork The most useful thing you can do costs nothing. Take your scruffiest mill certificate, a real customer purchase order and one genuinely awkward order from last month, the one with three cut lengths, a subcontract leg and a part delivery. Send them over before the demo and ask to see those. Clean data hides everything. Your data is the test. ## A short scorecard If you want something to score two or three systems against, this is enough: | Question | What a good answer looks like | |---|---| | What is the unit of stock? | A batch with heat, certificate, both weights, cost and location | | Offcut back to certificate? | Genealogy survives cuts, remnants and subcontract returns | | Invoice weight basis | Either basis, set per customer and grade, variance flagged | | Certificate gate | Despatch blocked, not warned, with logged overrides | | Cut pricing | Kerf and facing allowance in the pricing screen, by saw type | | Unweighed stock | Visible but unsellable until confirmed | | Migration | Staged, rehearsed, reversible, certificates re-linked by heat | | Pricing model | Shop floor and read-only logins not charged per head | | Data location and exit | Named region, structured export on exit | | Named limitations | At least one, offered without being pushed | Nine out of ten of those are about whether the system was built for steel or adapted to it. That is the whole decision. Everything else is preference. If you want to run that list against MetlSys with your own paperwork, [request a demo](/contact) and bring the worst PDF you own. --- ## Why your mill certs still live in a filing cabinet in 2026 Published 2026-08-15 by Mark Brookes. Source: https://metlsys.com/insights/certs-filing-cabinet-2026 Walk into most UK stockholders and you can still find the certs. A four-drawer cabinet by the goods-in door, or a shelf of lever-arch files sorted by year, or a shared drive folder called Certs with fourteen subfolders and a naming convention that changed twice. Somewhere in there is the 3.1 for a delivery from March. This is not a criticism of anyone in the trade. Every stockholder I have spoken to knows the filing is a weak point. They know it costs them Friday afternoons. What is worth asking is why it has survived twenty years of everything else going digital, because the answer is not laziness and it is not budget. ## Scanning the paper did not fix the problem Plenty of firms did the obvious thing. They bought a scanner, or the mills started emailing PDFs, and the cabinet became a folder. On the face of it that is progress. In practice it moved the problem rather than solving it. A PDF in a folder is still a piece of paper. It has a filename instead of a tab divider. You still have to know where it is before you can find it, and knowing where it is depends on somebody having filed it correctly, months ago, under pressure, at the end of a shift. So the certs end up spread across four places at once. Some in the folder on the server. Some sat in the buyer's email, because that is where the mill sent them. Some on the supplier's own portal behind a login one person has. And some still in the cabinet, because the delivery came in on paper and nobody scanned it. All four are the official copy. None of them is complete. The word that matters here is attachment. In almost every system a stockholder runs, a certificate is attached to something: an email, a delivery, a folder, a job bag. Attachments are cheap to create and expensive to find. That is the whole trap. ## The retrieval test Forget the filing for a second and test the other end. Pick a heat number at random from a despatch note eighteen months old. Time how long it takes to produce every certificate covering material from that heat, plus a list of every customer who received any of it. At most stockholders that is not a five minute job. It is an afternoon, and it needs the one person who knows how the folders are organised. If that person is on holiday, it is a bad afternoon. That test is the only measure of a filing system that counts. Not whether the certs are stored. They are always stored. Whether they can be retrieved against the thing a customer or an auditor will actually ask about, which is never a filename and is almost always a heat number, a batch, an order or a date range. ## What it costs, honestly The obvious cost is time. A cert request that should take a minute takes half an hour, and it lands at the worst moment, because customers ask for certs when their own audit or their own customer is chasing them. The second cost is worse and much quieter. Material that cannot be evidenced does not get sold as certified material. Remnants go back on the rack with a chalk mark and the paperwork trail dies there. The steel is still good. The heat is still known, in theory. But nobody will quote it to a job that needs a 3.1 because nobody wants to be the one who cannot produce the paper. Certified stock quietly becomes scrap value. The third cost only shows up on a bad day. If a customer raises a claim on material you cannot trace cleanly, the argument is no longer about the steel. It is about your records. That is not a position you want to negotiate from. ## An attachment is not a record Here is the distinction the whole thing turns on. An attachment is a file that sits next to your data. Your system knows it exists. It does not know what is in it. A record is the certificate as structured information. The heat number, the grade, the standard, the certificate type, the chemistry and the mechanical values, held as fields, with the original PDF kept alongside as the evidence. The system can now read the cert, not just store it. Once a cert is a record, three things become possible that were never possible with a folder. It can match itself. A certificate carrying heat 812449 finds the batch carrying heat 812449 without anyone deciding where to file it. In MetlSys certificates auto-match to batches by heat number for exactly this reason. It can be graded. EN 10204 types rank 2.1, 2.2, 3.1 and 3.2. If the system knows which type it holds, and the customer account carries a minimum type, the software can compare the two. MetlSys gates allocation and despatch on that comparison, with a manager override where a deficiency has to be accepted, and the override is logged. It can travel with the material. Split a bar, cut it, send it out for machining and take it back, and the child batches carry the same heat and the same certificate. Splits, cuts, remnants and subcontract returns all keep the genealogy. The trail does not break at the saw, which is exactly where a folder-based system loses it. ## The gate is the part people underestimate Most conversations about certificates are about finding them. The bigger win is not needing to. If despatch is gated on the certificate, an uncertificated batch cannot leave the warehouse by accident. That single rule removes most of the retrospective searching, because the awkward requests are nearly always for material that went out before the paperwork caught up. MetlSys shows uncertificated batches on the dashboard rather than leaving them to be discovered later. It also changes what happens at the point of delivery. Cert packs assemble into one PDF for the delivery and go out with the despatch, so the customer already has what they need. A cert request you never receive is worth more than a cert request you answer quickly. Where a customer does come back, the customer portal lets them self-serve their own orders, certificates and documents under their own login, on short-lived secure links. That is one fewer phone call landing on the office at ten to five. ## Getting the paperwork in without retyping it The reason certs are filed badly is that filing them properly has always meant typing. Somebody has to key the heat, the grade, the standard, the type and the values off a scruffy PDF, and nobody has time to do that for every delivery, so it gets skipped and the PDF gets dropped in a folder instead. That is the bottleneck, and it is the one thing that has genuinely changed in the last few years. MetlSys reads mill certificates, delivery notes, customer POs, supplier confirmations and subcontract paperwork into reviewable drafts. The extraction is shown against the source PDF before anyone commits to it. The rule we hold to is that nothing posts on its own. The AI proposes and a person confirms. In this trade a machine quietly writing a wrong heat number into a traceability chain is not a convenience, it is a liability. But the typing is gone, and with the typing gone the reason to skip proper filing goes with it. ## What good looks like You can describe it in one sentence. Every certificate in the business is a record, matched to a batch by heat, ranked by type, enforced at despatch, and retrievable by anyone in the office in under a minute. No cabinet. No naming convention. No one person who knows where things are. The filing cabinet survived this long because the alternative used to be more typing. It is not any more. If you want to see what your own certificates look like as records, [how MetlSys handles EN 10204 traceability and MTCs](/features) is the place to start. Bring your worst mill certificate PDF to a demo and we will run it. [Request a demo](/contact). --- ## Catch-weight invoicing explained: theoretical weight, actual weight, and how to bill steel without leaking margin Published 2026-08-01 by Mark Brookes. Source: https://metlsys.com/insights/catch-weight-invoicing-explained Two numbers describe the same bar of steel, and they almost never agree. There is the theoretical weight, worked out from the section and the length. And there is the actual weight, what the bar reads on the scales. Both are real. Both end up on paperwork. The gap between them is where a stockholder's margin quietly leaks away. This is catch-weight. Any trade that buys and sells by weight but handles discrete physical items lives with it. In steel stockholding it is not an edge case. It is every line on every order. Yet most inventory software treats weight as a single figure per stock line, which means the moment you sell steel, the software is already wrong. This is the plain-English version of what catch-weight invoicing actually involves, and what a system has to do to get it right. ## Why one weight is never enough A length of bar has a theoretical weight the mill's own tables will tell you: so many kilograms per metre, times the length. It is a clean calculation and it is useful. It is also not what the customer receives. Real steel varies. Rolling tolerances, mill finish, cut ends, rust and scale all move the actual weight off the theoretical figure. On a single bar the difference is small. Across a wagon load, across a month, across a year, it adds up to a number worth caring about. So a stockholder carries both weights on purpose. The theoretical weight lets you plan, price and quote before anything is on the scales. The actual weight is what you paid for at goods-in and what you should be paid for at despatch. A system that holds only one of them forces you to choose which truth to lose. ## Which weight do you invoice on? There is no single right answer, and that is the point. The correct basis depends on the material, the customer and the deal. Some material is sold on theoretical weight by convention, so the customer is billed on the calculated figure regardless of what the scales say. Some is sold on actual weight, so you weigh it and bill exactly that. A given customer might take one grade on theoretical and another on actual. The invoice has to follow the agreement, not a system default. Here is what the choice is worth on a single line. The numbers below are a worked example with round figures picked for clarity, not anyone's real order: | The same delivery line | Figure | |---|---| | Theoretical weight, from the section and the length | 1,000 kg | | Actual weight, read on the scales at goods-in | 985 kg | | Variance | 15 kg under, 1.5% | | Agreed price | £1.20 per kg | | Invoice line on the theoretical basis | £1,200.00 | | Invoice line on the actual basis | £1,182.00 | Eighteen pounds on one line is nothing. The point is that both figures are defensible, only one of them matches the agreement, and a system holding a single quantity cannot tell you which one it just used. Multiply that by every line your office ships in a year. This is where generic software falls down. It holds one quantity per line, so it can invoice on one basis only, and usually the wrong one. Then the office keeps the real weights in a spreadsheet next to the system and reconciles by hand. Every order is keyed twice. The two records drift apart the first time someone is busy, and you find the divergence at the worst possible moment: a customer weight query, a credit note, an audit. In MetlSys the choice is built in. Every batch carries a theoretical and an actual weight. Prices work per kilogram, per metre, per each or as a lump sum. Invoices raise from the delivery note on either weight basis, so the same order can bill one customer on theoretical and another on actual without a side spreadsheet keeping score. ## The rule that saves the most money: unweighed stock cannot be sold Here is the failure that costs stockholders the most, and it happens before the invoice is ever raised. Steel arrives on a delivery note carrying a theoretical weight. The actual weight arrives later, when someone puts the material on the scales. In most systems there is nothing between those two moments. The stock exists, so it can be allocated, sold and despatched on a number nobody has confirmed. When the real weight finally lands, it does not match, and now you are issuing a credit note or swallowing the difference. The fix is a two-stage receipt. Book the material in from the paperwork so it is visible and traceable straight away. But hold it as awaiting-weight and unsellable until someone confirms the actual weight on the scales. The stock is on the system. It just cannot leave on a guess. That is exactly how goods-in works in MetlSys. Material books in from the delivery note, sits as awaiting-weight, and cannot be sold until the actual weight is confirmed. It is a boring rule. It removes a whole category of weight variance, margin leak and awkward credit note before it can start. ## Variance: catch the outliers, ignore the noise If you are carrying two weights on every batch, you are also generating a variance on every batch. Most of that variance is noise. A fraction of a percent either way is just steel being steel, and flagging it would train everyone to ignore the flag. What you want is to catch the outliers. A batch that reads several percent under its theoretical weight is telling you something: a short delivery, a mis-measure, a data entry slip, or material that is not what the paperwork claims. That is worth a human decision before it reaches an invoice. MetlSys draws the line at two percent. Variance within band passes quietly. Variance over two percent is flagged for review, so a person looks at the exception rather than every line. You get the control without the noise. ## Closing the loop: despatch, proof, invoice Catch-weight does not end when the invoice basis is chosen. The weight has to be captured cleanly at the point the material leaves, and the invoice has to follow the delivery without a week's delay. The weighing itself is regulated, which is worth knowing if you are choosing what to weigh on. Scales used to settle a trade where goods are bought or sold by mass fall under the [Non-automatic Weighing Instruments Regulations 2016](https://www.gov.uk/government/publications/non-automatic-weighing-instruments/non-automatic-weighing-instruments-regulations-2016-great-britain), and the government's [weights and measures guidance for business](https://www.gov.uk/guidance/weights-and-measures-business-guidance) is the starting point for what else applies. The plain-English page on [equipment and records](https://www.gov.uk/weights-measures-and-packaging-the-law/equipment-and-records) makes the base rule explicit: you cannot use domestic scales to weigh goods you intend to sell. At despatch, the scales record gross, tare and net against the load, so the actual weight going out is measured, not assumed. The delivery note, consignment label and certificate pack generate together. Then the driver or the customer signs on their phone through a single-use electronic proof of delivery link, capturing the signature on glass along with any exceptions. A clean proof of delivery can raise the invoice automatically, on whichever weight basis the order specified. You can also raise invoices singly or in bulk if you would rather. The effect is the same: the invoice goes out the same day the signed proof comes back, not at month end when someone finally notices the paperwork returned. On thirty-day terms, every day between delivery and invoice is a day added to your debtor book for nothing. Cash flow in this trade is often not a finance problem. It is a paperwork-latency problem. When the invoice does raise, the full allocation chain stays intact behind it, and posting runs export a ledger-ready CSV for your accounting package. Credit notes for partials and returns work from the same thread rather than as a fresh guess. ## What good catch-weight handling looks like Put together, correct catch-weight invoicing is not one feature. It is a chain of small correct decisions: carry both weights on every batch, price in whatever unit the deal uses, refuse to sell what has not been weighed, flag only the variances that matter, measure the real weight at despatch, and let the signed proof of delivery raise the invoice on the agreed basis. Miss any link and the office rebuilds it by hand in a spreadsheet, and the margin leaks through the gap. You can see how the weighing, despatch and invoicing steps join up on the [features page](/features). ## See it on your own numbers If your team keeps a shadow spreadsheet of real weights beside the system, or issues credit notes because stock got sold before it was weighed, the fix is not more discipline. It is software that treats theoretical and actual weight as two facts about the same steel, from goods-in to the signed proof of delivery. Bring a real example: a batch with a weight variance, a customer you bill on theoretical, a delivery that went out before it was weighed. [Request a demo](/contact) and we will run it through in front of you. --- ## Generic ERPs don't know what a heat number is Published 2026-07-23 by Mark Brookes. Source: https://metlsys.com/insights/generic-erp-heat-number Every stockholder has sat through the same demo. A polished salesperson, a generic ERP, and the line that ends every objection: "we can configure that." Ask about catch-weight. We can configure that. Ask about mill certs. We can configure that. Ask how it tracks an offcut back to its cast. Pause. We can configure that. I have built software for a living for a long time, and I built MetlSys specifically for this trade. So let me be straight about what "we can configure that" actually means. It means a consultant will bolt fields onto a system that was designed for boxes on shelves, and hand you the gaps to manage in a spreadsheet. For four things in steel stockholding, that is not a shortcut. It is the whole job, done badly. ## The four things you cannot configure in A generic ERP starts from a part number and a quantity. Steel does not work like that. A stockholder's data model starts from a batch: a physical lot with a heat number, a certificate, an actual weight, a cost and a bin. Everything below flows from that difference, and no amount of custom fields closes the gap. ## Catch-weight and dual units You buy a bar at its theoretical weight and sell it at its actual weight. Both numbers are real, both matter, and they rarely agree. A generic system holds one quantity per line. Bolt a second weight field onto it and you have data, but nothing that uses it: no variance check, no choice of invoice basis, no rule that stops unweighed stock being sold. The weight is not a soft number either: goods bought or sold by mass are weighed on regulated equipment, and the government's [weights and measures guidance for business](https://www.gov.uk/guidance/weights-and-measures-business-guidance) sets out what that means in practice. MetlSys is built around this. Every batch carries a theoretical and an actual weight. Prices work per kg, per metre, per each or as a lump sum. Invoices can raise on either weight basis, and a variance over 2% is flagged for review before it becomes a margin leak or an awkward credit note. ## Heat genealogy through cutting This is the one that breaks configured systems for good. A cut does not create a new product. It creates a child of the same cast, with the same heat number, the same certificate and a share of the parent cost. Split a bar, saw a plate, send material out to the platers and back, and every piece has to keep that thread. A generic ERP treats a cut as a stock adjustment: quantity out here, quantity in there, link broken. To rebuild the chain for an auditor you rely on memory and a folder. In MetlSys the genealogy survives splits, cuts, remnants and subcontract loops by design. A works order consumes a parent batch and produces outputs, remnants and scrap that inherit the heat and certificate automatically. The offcut on the rack is still certified, sellable material, not scrap with a chalk mark. ## Cert-gated despatch Your customer's order says 3.1 minimum. The batch you are about to load only ever had a 2.2. In a configured system, nothing stops that despatch except the person doing it noticing in time. On a Friday afternoon, at volume, people do not always notice. Those type numbers are not house style. They come from [BS EN 10204:2004, Metallic products. Types of inspection documents](https://knowledge.bsigroup.com/products/metallic-products-types-of-inspection-documents), the standard that defines what each inspection document declares and who is allowed to sign it. The British Stainless Steel Association has warned about [the misuse of EN 10204 certificates](https://bssa.org.uk/the-misuse-of-en-10204-material-test-certificates/), including traceability lost between the material, the heat number and the paperwork, which is exactly the gap a configured stock system leaves open. A rule you have to remember is not a control. MetlSys ranks certificate types 2.1, 2.2, 3.1, 3.2, lets each customer carry a minimum acceptable type, and gates allocation and despatch on it. If the batch does not hold a good enough certificate, the despatch paperwork does not print. A manager can override for a genuine reason, and the override is logged. That is the difference between a policy and a control: one lives in someone's head, the other lives in the system. ## Cut-piece pricing Quote a cut length and the price is not the length times a rate. It is the cut length plus the kerf plus a facing allowance at each end, with the kerf set by the saw type, and a check that you are not promising an offcut too short to exist. This is ordinary trade arithmetic. It is also arithmetic a generic pricing engine has never heard of. MetlSys does the saw maths where the order is priced. Chargeable length is cut length plus kerf plus facing allowance, kerf per saw type, with minimum-usable-length flags so you do not sell a remnant that cannot be made. Nobody has to keep a side spreadsheet of cutting allowances that only one person understands. ## What each gap costs when it lives in a spreadsheet None of this is fatal on its own. Stockholders have run for decades on the ERP-plus-spreadsheet arrangement, and most still do. The cost is quieter than a crash, and it adds up. The shadow spreadsheet is a second system nobody admits to owning. It holds the weights the ERP cannot, the cutting allowances the pricing screen cannot, the cert requirements the despatch screen does not enforce. Every order is keyed twice, once into each system, and the two drift apart the moment someone is busy. The divergence is silent. You find it at the worst time: an audit, a weight query, a customer who received material against the wrong certificate. Then there is the person. The shadow spreadsheet always belongs to one person who understands how it hangs together. When they are on holiday, the office slows. When they leave, part of how your business works walks out with them. That is a real operational risk hiding inside a file called stock_v3_final.xlsx. And there is the margin. Weight variances nobody reconciles. Offcuts weighed in as scrap because the record died even though the material did not. Cut pricing that quietly under-recovers the saw. These are small leaks. In a low-margin trade, small leaks are the margin. ## What steel-native actually means Steel-native is not a longer feature list. It is a data model that starts where the trade starts, at the batch, so heat, cert, weight and cost travel together from the first purchase order to the signed proof of delivery without anyone stapling them back on. When the system starts from the batch, catch-weight is not a bolt-on, it is how stock is counted. Genealogy is not a report you rebuild, it is preserved by every cut. The cert gate is not a reminder, it is a wall. Cut pricing is not a spreadsheet, it is the order screen. You can see the full feature set on the [features page](/features). A configured generic ERP can be made to store these things. It cannot be made to start from them. And in this trade, where you start is the whole game. ## See it on your own material If your office runs on an ERP plus the spreadsheet nobody will admit to, the fix is not more discipline or another custom field. It is a system that knows what a heat number is because it was built around one. Bring your own worst example: a cut that went out for machining, a batch with a weight variance, a cert requirement that nearly slipped. [Request a demo](/contact) and we will trace it in front of you. --- ## EN 10204 explained: 2.1, 2.2, 3.1 and 3.2 certificates, and what stockholders actually need to do with them Published 2026-07-20 by Mark Brookes. Source: https://metlsys.com/insights/en-10204-explained Every despatch in this trade rests on a piece of paper most software has never heard of: the mill test certificate. EN 10204 is the standard that says what that paper is worth. Everyone in a steel office says "3.1" a dozen times a day, but the differences between the four types, and what a stockholder is actually obliged to do with them, catch people out more often than anyone admits. This is the plain-English version. ## What EN 10204 actually is EN 10204 is a short European standard with one job: it defines the types of inspection document a metal producer can issue with a delivery. It does not tell you what to test or what the limits are. That comes from the product standard and the order. EN 10204 only answers two questions: what is being declared, and who is allowed to sign the declaration. In the UK it is published by BSI as [BS EN 10204:2004, Metallic products. Types of inspection documents](https://knowledge.bsigroup.com/products/metallic-products-types-of-inspection-documents), and it is the 2004 edition that cut the list down to the four types everyone quotes today. That second question is the one that matters. The four types are not a ladder of "more testing". They are a ladder of independence: how far the person signing stands from the people who made the material. ## The four types, in one paragraph each **Type 2.1, declaration of compliance with the order.** The manufacturer states that what they supplied complies with the order. No test results are attached. It is signed by the manufacturer, with no independence requirement. It is a promise, not evidence. **Type 2.2, test report.** The manufacturer states compliance and attaches test results, but the results come from routine, non-specific inspection. The numbers on the paper are not necessarily from your batch. Signed by the manufacturer, again with no independence requirement. **Type 3.1, inspection certificate.** This is the workhorse of the trade. The results are specific to the material actually supplied, tested against the order and the product standard, and the document is validated by the manufacturer's own authorised inspection representative, someone independent of the manufacturing department. Batch-specific evidence, signed by someone inside the mill but outside production. **Type 3.2, inspection certificate with third-party involvement.** Same batch-specific results, but the certificate is countersigned by an independent inspection body or the purchaser's own representative, who witnessed or verified the testing. This is what nuclear, offshore, pressure and defence work tends to demand, and why a 3.2 requirement can add weeks and real money to a mill order. The same four types, side by side: | Type | What it certifies | Who validates it | |---|---|---| | 2.1 Declaration of compliance with the order | Compliance with the order. No test results attached | The manufacturer. No independence requirement | | 2.2 Test report | Compliance, plus results from routine non-specific inspection that are not necessarily from your batch | The manufacturer. No independence requirement | | 3.1 Inspection certificate | Results specific to the material actually supplied, tested against the order and the product standard | The manufacturer's authorised inspection representative, independent of the manufacturing department | | 3.2 Inspection certificate with third-party involvement | The same batch-specific results, witnessed or verified as well as reported | An independent inspection body, or the purchaser's own representative, countersigning | If you remember one thing: 2.x documents are the maker talking about their process; 3.x documents are evidence about your actual material, with an independent signature on it. The British Stainless Steel Association's note on [EN 10204 test certificates](https://bssa.org.uk/bssa_articles/bsen-10204-test-certificates-for-stainless-steel-products/) covers the same ground from the mill's side, if you want a second reading of it. ## The stockholder's real problem is not the certificate. It is the match. Mills are generally good at issuing certificates. The failure mode in a stockholding business is downstream: connecting the right certificate to the right material, and keeping that connection alive through everything a stockholder does to steel. The heat number is the thread. It is the identity of the cast the material came from, and it appears on the certificate and, if the mill has done its job, on the material. The stockholder's obligation is to preserve that thread: - When a delivery arrives, each batch booked in must be tied to the certificate carrying its heat number, not just "a PDF from that supplier somewhere in the inbox". - When a bar or plate is cut, every piece that comes off the saw inherits the parent's heat and certificate. A cut does not create new material; it must not create new paperwork ambiguity either. - When material goes out for processing and comes back, the heat travels with it. - When a customer or an auditor asks, months later, you need to walk from the despatch note back to the certificate in minutes, not spend a Friday afternoon in the filing cabinet. Most stockholders can do all of this. The question an audit really asks is whether you can prove it, on demand, for any batch, without heroics. ## Where paper-and-spreadsheet systems come apart Three failure patterns come up again and again. 1. The certificate exists but lives as an email attachment, filed by supplier or by month, so finding it means remembering the delivery rather than knowing the heat. 2. The heat number was retyped somewhere along the way, and a transposed digit silently broke the chain. Nobody notices until the one day it matters. 3. Material was despatched to a customer whose orders require 3.1 minimum, against a batch that only ever had a 2.2. Nobody decided that; the system just had no way to stop it. None of these are character flaws. They are what happens when certificates are treated as attachments instead of records. The BSSA has raised the same worry from the standards side, warning about [the misuse of EN 10204 certificates](https://bssa.org.uk/the-misuse-of-en-10204-material-test-certificates/): re-issued or modified documents passed off as originals, and traceability lost between the material, the heat number and the paperwork. ## What "certificates as records" looks like The alternative is to make the certificate a first-class record in the stock system, not a file stapled to one. In MetlSys, a mill test certificate holds the PDF plus the extracted data: heat, grade, standard, the chemistry and the mechanical values. Certificates auto-match to stock batches by heat number, so the thread is made by the system at goods-in rather than by memory later. Certificate types are ranked 2.1, 2.2, 3.1, 3.2; each customer can carry a minimum acceptable type, and allocation and despatch gate on it. If a batch does not hold a certificate good enough for that customer, the despatch paperwork does not print, and any manager override is logged. Cutting and processing keep the genealogy: every offcut and every processed piece inherits its parent's heat and certificate automatically, so a remnant on the rack is still certified, sellable material rather than scrap with a chalk mark. The full traceability workings are described on the [features page](/features#traceability). ## What to do about it If you hold steel and the words "where's the cert for this?" cost your office more than a minute, the fix is not more discipline. It is filing by heat number, matching at the door, and letting the system enforce what your customers' orders already require. That is a large part of why MetlSys exists. If you would like to see a certificate matched to a batch in front of you, with your own worst PDF, [request a demo](/contact). ## Legal - [Privacy Policy](https://metlsys.com/privacy) - [Cookie Policy](https://metlsys.com/cookies) - [Terms of Service](https://metlsys.com/terms) - [Acceptable Use Policy](https://metlsys.com/acceptable-use) - [Data Processing Agreement](https://metlsys.com/dpa) - [Accessibility statement](https://metlsys.com/accessibility) - [Service levels](https://metlsys.com/service-levels)